Upgrade or modify an existing power supply
Upgrade your power supply, connect an overhead network to an underground connection or relocate an electrical asset.
If you need a temporary power supply for your builder to carry out works, or a permanent supply to your new home, you'll need to install a meter so you can be billed for the electricity you use. There must already be a connection to the electricity network available at the property i.e. a service pillar (green dome). They’re typically located just inside the property boundary.
You can call us to open an account, or complete the forms below. If you're already a customer with us, please have your account number handy so we can link your accounts in our system. If you need a temporary supply, we'll provide you with a Customer Reference Number (CRN) to provide your builder and/ or electrical contractor, to be used on all future correspondence.
How much will it cost?
What to do next?
If you're connecting power to a property or block of land where there has never been a connection to the Horizon Power network before, you'll need to request a new connection.
How much will it cost?
What to do next?
Are you a developer?
You may require the Developers authorisation and design information package.
A fee of $1,215.00 is payable to provide network information to developers to assist with their planning. This fee is a fixed fee regardless of the size of the development works.
Running an underground cable from the pole in the street to your property is commonly referred to as a pole to pillar connection. A pillar is connected to the network and installed inside your property, close to the side and front boundaries. You need to organise an electrical contractor to install a mains cable from the pillar to your meter box to complete the connection.
How much will it cost?
You may qualify for the subsidised rate of $4,973.50 (up to 3 dwellings) if you meet the terms and conditions. If not, your application will be assessed and quoted on a case-by-case basis. An underground power supply is mandatory for all new connections and upgrades. Refer to the form below for more information.
What to do next?
Complete the form below to request an unmetered supply, such as streetlights, traffic lights and boom gates.
How much will it cost?
What to do next?
Upgrade your power supply, connect an overhead network to an underground connection or relocate an electrical asset.
There are a number of reasons why you may need to disconnect your power supply while work is carried out at your property.